105 km
0 m
Nisip
First line
Family hotels
Heated Pools Operation Schedule:
Indoor pool (heated): 01.04.2025 – 30.04.2025 and 01.10.2025 – 07.11.2025
Waterfall pool (heated): 01.04.2025 – 30.04.2025 and 01.10.2025 – 07.11.2025